Thursday 26 December 2013

PROJECT 8: LIVE PERFORMANCE.


LIVE PERFORMANCE




Project 8: Live Performance (RUS104 Performance and Awards Night 2013) was the last ever Project for our Studio of RUS104 its  The Lost Kingdom that night each Major are separated by their own Kingdom such as Demak (Construction Management), Srivijaya (Architecture), Singhasari (Interior Design), Langkasuka (Urban Planner), Majapahit (Quantity Surveyor), Pagar Riung (Building Surveyor) and Mataram (Buiding Technology). I was of Demak Kingdom .


This me in that night really i enjoyed that live performance even i did not understand some showing because they used malay language , i was chose my costume by self i just flow what meaning of our kingdom , 





My group construction management (Demak) kingdom 


Wednesday 25 December 2013

PROJECT 7: EXHIBITION: The RUS104 XZbition 2013 of HBP


The RUS104 XZbition





this is project 7 , its held in HBP at the DRUM on Monday 16 of December , there was shown all the projects that were done by the students from first project until the last group huge project. the Lecturers chose the best product to be shown in that day and i am luck I came out just with one project its project 3A L-shape , 



Construction Management Section 










 it was hard week we worked together as  Construction Management group, everyone was contributed in this project even we are non design group, on Exhibition day was amazing day it was first time for me to attended like that day as every projects i did, also this project  i got experience and  profit from  what i did .

Thursday 28 November 2013

Project 6 – Design & Build A Small Scale Building

Project 6a: Amphitheatre Stage Design 






Project 6b: Project Report





This is project 6 A, B , this is project we did as group 16 students so we divied our group for two section one is design and sketch group and one is report group , actually first time i joined design group then i moved to report group because my sketch  not good and may major is construction management , 



Project 6c: Physical Scale Model




 OUR MODEL











Friday 8 November 2013

PROJECT 5: NEIGHBOURHOOD & COMMUNITY



Project5A: Neighbourhood Elements: Existing Condition



This is project 5A its individual project , before i start this project i visited site lcocation with group and i chosen 1)     Sunway Merica, Sg. Ara, Penang . it was good experience to visit site location and meet some workers and asks  them about what they doing  and how they feeling . the project 5A about key plan , site location , map of penang and some sketching with picture about what i see in that location and i thing need to amendment or change .



Project 5B: Neighbourhood Elements: Proposed Improvemen



This is project 5B its sketch about that things i saw it in location and i indicated about it in project 5A 
first , there is no walk way for disable people so i created in this paper . second , there is no automitic gate and guard room then i add it .third, the material of WAKAF in garden was from aluminium and some pieces was broken that not comfortable and safe so i amendment the material to wood .

PROJECT 4: PRESENTATION DRAWINGS



DRAWING show PERSPECTIVE and AXONOMETRIC
(with human figure shown)



This is presentation drawings for that chair with table L-shape we did as group in project 4 , i was drawing to showing PERSPECTIVE and AXONOMETRIC with human figure shown , for perspective i sketched the chair from rear side to showing human figure when stay on the chair from back and appear shade side of human . the axonometric sketched indicated to drawing by three dimensional also from back side .


========================================================================


DRAWING showing PLANNING of chair 



This is drawing appeared the chair from all the side front , rear , right , left and plan mean top of chair , first i  drew the plan then front by used made lines from every point i drew in plan end of where start drawing front , then i drew back  after that i made line from 30 degree to drawing right and left side and made lines as what i did when i was drew front side .

PROJECT 3B: OBJECTS CONNECTION








OBJECTS CONNECTION

This connection chair and table we did as group member we are three students the conception of this sculpture its L-shape , we use recycle material as woods , the conception of this project its big chair the seat of chair made from fabric as width and length of lines to make the chair more comfortable and small table in corner with glass on the top joining relax and  style sofa as L-shape .

PROJECT 3A: OBJECT CREATION




OBJECT CREATION


I selected to made his Sculpture 3D because i like to make 3D things , I made it from symbol papers and corks, made like this Sculpture depends on drawing and cutting carefully . before come out with this Sculpture i was make some Sculpture then finally i choose this one its just about 3D house with main gate , garden and wall house and i focused making 3D for house .